PPN 006 / PPN 06/21 compliance: the mistakes that fail UK bids
PPN 06/21 is the Procurement Policy Note the Cabinet Office published in June 2021. People call it PPN 006 too. It means any supplier bidding on an in-scope UK central government contract worth more than £5 million a year has to hold a compliant Carbon Reduction Plan. Buyers assess it as pass or fail at selection, not as a scored criterion.
That is what makes the errors on this page so expensive. A weak Carbon Reduction Plan does not lose you a few marks. Under Cabinet Office guidance it can remove your bid from the process entirely, before an evaluator opens your technical or commercial response. There is no partial credit, and buyers cannot waive the requirement for contracts that meet the threshold.
The £5 million figure is the legal floor, not the practical ceiling. NHS trusts, local authorities, housing associations, universities and framework operators increasingly ask for a Carbon Reduction Plan well below that value. This guide sets out the specific mistakes that cause plans to fail, gives you a pre-flight checklist with clear pass/fail cues, and shows you how to test your plan before the deadline. For a plain-language explainer of the policy itself, see what is PPN 006.
The top 7 fatal mistakes
Each of these is a common reason a Carbon Reduction Plan is rejected at the selection stage of a UK public sector tender. Any one of them can be enough on its own.
-
1
Unsigned or stale director sign-off. The plan must be signed by a named director or equivalent, with job title and date. An unsigned plan, or one signed by someone who is not a director, is non-compliant. A sign-off dated more than 12 months before submission is routinely challenged. Some buyers state outright that the plan must have been updated within the previous year.
-
2
Missing mandatory Scope 3 subsets. The Cabinet Office technical standard requires specific Scope 3 categories, not a vague acknowledgement. At minimum your plan must quantify business travel, employee commuting, operational waste, and upstream and downstream transportation and distribution. Omitting any of these is a template failure. So is writing "Scope 3 quantification is in progress" with no figures.
-
3
Outdated or non-DESNZ carbon factors. All calculations must use the UK Government DESNZ greenhouse gas conversion factors for the reporting year. Factors from a prior year, or from a non-UK source, are a methodology error any evaluator can spot against the published tables.
-
4
No baseline comparison or missing trajectory milestones. Stating current-year emissions with no named baseline year, no baseline figure, and no interim milestones on the path to net zero by 2050 leaves an evaluator nothing to measure progress against. A 2050 commitment in isolation, with nothing between now and then, does not read as a credible plan.
-
5
Offsets without gross emissions reductions. Carbon offsetting cannot substitute for reducing your own emissions. A plan that leans on offset purchases to claim progress, without evidencing gross reductions from specific measures, will be treated as greenwashing rather than a reduction plan.
-
6
No public URL on the supplier website. The plan must be published and publicly accessible on your own website before the tender deadline. A plan that exists only as a tender attachment, sits behind a login, or returns a 404 when the buyer checks the link is treated as unpublished.
-
7
Generic, non-standard PDF statements. A sustainability vision statement, an ISO 14001 certificate, or a one-page "our commitment to the planet" PDF is not a Carbon Reduction Plan. The document has to follow the Cabinet Office technical standard structure (baseline, current year, net zero commitment, reduction measures, declaration) or it fails on its face.
Pre-flight checklist
Run every line against your published plan the week before you submit. If any item lands on the fail cue, fix it before the deadline, not after.
Director sign-off
Pass: named director, job title, and a signing date within the last 12 months.
Fail: no signature, a non-director signatory, or a date more than a year old.
Baseline year
Pass: an explicit baseline year is named, with total tCO2e broken down by scope.
Fail: "pre-pandemic levels", "historical average", or no baseline figure at all.
Current-year emissions
Pass: most recently completed year, tCO2e by Scope 1, 2 and 3, with the percentage change against baseline stated.
Fail: scopes listed without figures, or a rise in emissions with no explanation.
Scope 3 subsets
Pass: business travel, employee commuting, operational waste, and upstream and downstream transportation and distribution are each quantified.
Fail: any of those four categories missing, or Scope 3 addressed only in narrative.
Conversion factors
Pass: DESNZ factors for the correct reporting year, cited by year and source.
Fail: factors from a different year, a non-UK source, or no factor source stated.
Net zero commitment and milestones
Pass: an explicit commitment to net zero by 2050 across all scopes, plus at least one interim milestone (for example 2030) expressed in tCO2e.
Fail: "we aim to", a percentage with no baseline anchor, or no waypoints before 2050.
Reduction measures
Pass: specific actions, each with the emission source, an implementation date, and an estimated tCO2e saving.
Fail: categories such as "improve energy efficiency" with no action, date, or quantified impact.
Offsets
Pass: gross emissions reductions are evidenced first; any offsetting is disclosed separately and not counted as a reduction.
Fail: progress claimed on the back of offset purchases with no gross reduction shown.
Publication
Pass: a clean, canonical URL on your own website, live and current, that you have opened the day before submission.
Fail: attachment only, behind a login, a 404, or a page last updated years ago.
Format
Pass: follows the Cabinet Office technical standard structure section by section.
Fail: a generic sustainability statement, policy summary, or certificate standing in for the plan.
Check your plan against the standard before submitting
The checklist above is quicker to run with a second pair of eyes. The free PPN 006 compliance check takes about 60 seconds, tests your plan against the procurement standard, and returns a clear pass/fail result with the gaps flagged, so you catch the disqualifying errors while there is still time to fix them.
Check your plan against the PPN 006 procurement standard before submitting.
Free, no sign-up, results in under two minutes.
Run the free PPN 006 checkHow this guide differs from “what is PPN 006”
Still getting your bearings on the policy? Who it applies to, the £5 million threshold, the six mandatory elements of a Carbon Reduction Plan, the annual update requirement. Start with our explainer: What is PPN 006? Procurement Policy Note 06/21 explained. That page tells you what the rules are.
This page is the other half: what goes wrong in practice, and how to catch it. Use it once you already have a draft plan and need to pressure-test it before a deadline. The two are designed to be read together.
For the questions carbon and net zero attract inside the tender response itself, like social value sections and SQ and ITT environmental questions, see the Net Zero tender questions guide. For a full worked walkthrough of building the plan from a blank page, see how to write a Carbon Reduction Plan (PPN 006 guide).
Facing a tender deadline? Generate a verified, PPN 006-ready Carbon Reduction Plan with official DESNZ factors.
Get the Single-Bid Pass for £99Or CarbonVerified Pro at £190/yr for ongoing annual updates.
Frequently asked questions
Sources & related
- What is PPN 006? Full policy guide (CarbonVerified.uk)
- Net Zero questions in UK public sector tenders (CarbonVerified.uk)
- How to write a Carbon Reduction Plan, PPN 006 guide (CarbonVerified.uk)
- PPN 006: Taking Account of Carbon Reduction Plans (GOV.UK)
- PPN 006 Technical Standard for Completion of Carbon Reduction Plans (GOV.UK)
- Government Conversion Factors for Company Reporting, DESNZ (GOV.UK)